[1]
2023. Analisis Faktor Keterlambatan Waktu Pelaksanaan Proyek Jalan Nasional di Jawa Timur . Jurnal Teknik Sipil. 15, 2 (Jan. 2023), 48–59. DOI:https://doi.org/10.56444/jts.v15i2.317.