“ANALISIS METODE PERCEPATAN TIME COST TRADE OFF PADA PROYEK REVITALISASI TERMINAL PENUMPANG TIPE A BOBOTSARI” (2024)
Journal of Civil Engineering and Technology Sciences
, 3(2), pp. 48–57. doi:
10.56444/jcets.v3i2.2392
.