“ANALISIS PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN TANAH (STUDI KASUS PROYEK NORMALISASI SUNGAI JUWANA)”. 2022. Journal of Civil Engineering and Technology Sciences 1 (1): 17-23. https://doi.org/10.56444/jcets.v1i1.39.