ANALISIS PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN TANAH (STUDI KASUS PROYEK NORMALISASI SUNGAI JUWANA). (2022). Journal of Civil Engineering and Technology Sciences, 1(1), 17-23. https://doi.org/10.56444/jcets.v1i1.39