(1)
ANALISIS PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN TANAH (STUDI KASUS PROYEK NORMALISASI SUNGAI JUWANA).
JCETS
2022
,
1
(1), 17-23.
https://doi.org/10.56444/jcets.v1i1.39
.