[1]
2022. ANALISIS PERHITUNGAN WAKTU DAN BIAYA PEKERJAAN GALIAN TANAH (STUDI KASUS PROYEK NORMALISASI SUNGAI JUWANA).
Journal of Civil Engineering and Technology Sciences
. 1, 1 (Apr. 2022), 17–23. DOI:
https://doi.org/10.56444/jcets.v1i1.39
.